
A wide variety of products in small quantities, frequent special orders, making it difficult to quickly respond to the production schedule.
Production scheduling relies on manual experience and the efficiency of process coordination is low.
The transfer of semi-finished products between processes relies on manual operations, resulting in a serious backlog of work-in-progress.
The delivery schedule is unstable, the response is abnormally slow, and customer satisfaction cannot be guaranteed.

The process is complex and involves multiple steps, with large differences in the pace of each step
There are many specifications of raw materials, making warehouse management difficult
Finished product warehousing occupies a large area and requires high manual handling intensity
Cardboard is mixed and stacked, making paperless management difficult

The storage and handling processes are prone to damage the appearance quality of the roll film
Multiple machines operate simultaneously, production scheduling relies on experience, and the efficiency of changing orders and switching is low.
The production process is opaque and abnormal findings are delayed.
The quality traceability chain for batches is long and the traceability efficiency is low.

Frequent order changes and complex consumables management
Small order quantities, short delivery cycles, and high planning response pressure
Warehouse location management is complex, inventory turnover is fast, and material preparation accuracy is difficult to guarantee
Mixed production of digital printing and traditional printing makes scheduling and collaboration difficult
Order priority management span>
Limited Capacity Scheduling span>
Resource constraint balance span>
Dynamic insertion adjustment span>
Delivery commitment management

Process Collaboration
Work order issuance
Production Execution
Automatic material ordering
Automatic job reporting
Quality Management
Exception handling
Work-in-process Control

Machine transformation (offset printing machine/gravure printing machine/laminating machine/slitting machine/die-cutting machine, etc.)
Data Collection and Analysis;
SCADA System
OEE Comprehensive equipment efficiency management

