The management of mixed storage of multiple specifications and overweight materials is complex.
The stacking of sheet materials occupies a large area and has a low utilization rate of storage space.
Batch production management is complex and requires strict batch traceability.
The production and warehousing rhythms are not synchronized, and the efficiency of line-side material supply is low

Long sized materials have high storage difficulty and low storage utilization rate; High safety risks during transportation
Complex management of mixed storage of different specifications
Low logistics efficiency in the workshop, affecting production pace

Coil materials are heavy, and their transferring and storage have high requirements for equipment
The manual scheduling is inefficient and it affects the continuity of production.
There are many batches of coil materials, and they are prone to be mixed in production, storage and shipment
The information regarding storage, production and shipment is not transparent, making the management extremely challenging.

There are a wide variety of materials and multiple batches, making it very difficult to manage the inventory manually.
The demand for materials is unstable, resulting in frequent inventory overstock or material shortages.
The supply of production materials is slow, which affects production efficiency.
Lack of a unified inventory and distribution management system
Development and optimization of Master Production Plan (MPS)
Limited Capacity Scheduling (APS) and Capacity Balance
Dynamic reordering of insertion and emergency orders
Multi production line collaborative scheduling